PROJECTS

S.no NAME OF PROJECT CLIENT PROJECT COST STATUS
1 Construction of 6-lane Greenfield corridor from Ramnagar to Kacchi Dargah NH-119D (from Km 109+700 to Km 122+300), including widening of the existing NH-31 (from Km. 196+700 to Km 198+600), as part of the Amas-Darbhanga highway in the state of Bihar on EPC Mode SGIHPL 433.33 Cr. ON GOING
2 Construction of Four lane Greenfield National Highway in the State of Bihar Starting From (NH-30) near Saristabad (Patna) to Nathupur (Project end point of Patna-Gaya-Dobhi section of NH-83) to connect Missing Link of Patna-Gaya-Dobhi Corridor in the state of Bihar on EPC Mode (Total Length 3.914 Km) HSEA 96.77 Cr. ON GOING
3 Overlaying in NH19, Chhapra-Hajipur Expressway Ltd in state of Bihar from Km 143+300 to Km 151+000 in the Chhapra bypass stretch of the project. MADHUCON 23.00 Cr. COMPLETED
4 Maintenance of NH-77 from Hajipur to Muzaffarpur from Km 102+000 to Km146+200 PHPL 11.00 Cr. COMPLETED
5 Widening and Strengthening work from Km 146+200 to Km148+100 of NH-77. JMC 12.36 Cr. COMPLETED
6 Repairing and Maintenance work in Patna-Gaya-Dobhi Section of Existing road of NH-83 Km 0+000 to 105+000 JMC 36.95 Cr. COMPLETED
7 Repairing & Maintenance work from Km 143+200 to Km156+600, Km174+300 to Km179+700 & Km181+500 to Km197+800 of existing road of NH-19 JMC 14.23 Cr. COMPLETED
8 Earth Work in NH19, Chhapra-Hajipur Expressway Ltd in state of Bihar from Km 143+300 to Km151+000 in the Chhapra bypass stretch of the project MADHUCON 14.00 Cr. COMPLETED
9 Earth Work in NH28, Gopalganj-Gorakhpur section in the state of Bihar. PUNJLLOYD 6.00 Cr. COMPLETED
10 Earth Work in NH77, Hajipur-Muzaffarpur section in the state of Bihar. GRIL 5.40 Cr. COMPLETED
11 Earth Work in NH19, Chhapra-Hajipur Expressways Ltd. in the state of Bihar MADHUCON 16.00 Cr. COMPLETED
12 Earth work in BSC & C&C SH_89 (Siwan to Siswan) and SH_86 (Saraiya to Motipur) in Bihar State C&C 4.50 Cr. COMPLETED
13 Construction of water system in NTPC Kanti Muzaffarpur. RAMESH CHANDRA 3.50 Cr. COMPLETED
14 PMGCY Road from Nayagaon to Mathchilao Km. 0.00 to Km. 5.00 in the state of Bihar. PMGCY 80 LAC COMPLETED
15 Work of providing laying, testing & commissioning sewerage system and design & construction of STP at Munger town (BUIDCO/SWG-STP/2011-12/17) BUIDCO 17.40 Cr. COMPLETED
16 Lift irrigation for NVDA-Omkareswar Right Bank Lift Canal – Disnet Excavation & Laying work in the state of MP.   10.00 Cr. COMPLETED